The installation of the K20 ceramic rainscreen panels has commenced on 1282 Boylston Project. As expected, the installation is very fast and the setters are able to install a panel in about two minutes. The first 72 panels went up in half hour. Enjoy the photos and please stay tuned for more progress updates:
The first container of horizontal profiles arriving at the jobsite.
The basement storage for the material
The aluminum back up system partially installed on the building
K20 Aluminum back up system on the building
First Panels on the building: Flat, Stripy, and Grooved Profiles
First elevation on the east tower. The portion of 72 panels completed in half hour.